Respectful transformation
90% of the original structure retained
1,600 sq m of heritage features preserved
Net Zero construction site powered by our solar farm in Norfolk
From a stunning reception accessed directly via Pall Mall, to 12 floors of flawless office space, explore the building’s impeccable redesign. With stunning 360° views, everything has been carefully crafted to complement the icon’s signature style and offer an experience in a class of its own.
Flexible amenity space on the third floor features meeting rooms, co-working spots and events space, alongside self-contained new landmark restaurant; LV3.
London’s first and oldest covered arcade is being reimagined along with New Zealand House, offering a selection of premium outlets at your doorstep. Small boutiques, flavourful bites and signature retail experiences will populate the Royal Opera Arcade giving it the buzzing atmosphere it was once renowned for.
90% of the original structure retained
1,600 sq m of heritage features preserved
Net Zero construction site powered by our solar farm in Norfolk
7,000 items donated to charities for re-use
98% waste diverted from landfill
450,000 litres of rainwater harvested annually
72% carbon savings compared to a new build
40% biodiversity net gain
Large third floor communal terrace
Carefully designed Grade A amenity space
Improvements to the public realm
Access to external terrace overlooking Pall Mall, featuring hot-desking, meeting rooms, event spaces, tea point and phone booths Link to new restaurant at L3
1 person per 10 sq m
Typical floor to ceiling height is 2.7m (max) to the underside of services and 3.1m (max) to the soffit
A complete facade replacement retaining overall external appearance
1 x 15 person passenger lift 2 x 17 person passenger lift
Innovative smart façade technology provides passive shading reducing energy demand for cooling by 17% Low energy fan coil air conditioning distributing 14ls per person
105 cycle spaces: accessed via Haymarket loading bay entrance Changing facilities: 96 lockers and 11 showers
Installation of all new M&E services Capped services for tenant: waste connections and water connections available for on-floor tea points
Andrew Wedderspoon | Savills
andrew.wedderspoon@savills.com +44 (0) 20 7409 8706
Mark Radford | The Crown Estate
mark.radford@thecrownestate.co.uk +44 7730 318 148
Kate Miedzianowska-Sinclair | The Crown Estate
kate.sinclair@thecrownestate.co.uk +44 7934 602 606
Kate Green | The Crown Estate
kate.green@thecrownestate.co.uk +44 7816 155 037